Pisa Hospital

Pisa Hospital

Case Studies   Pisa Hospital (Fire)   r   $6.77m Total estimate of damages (with replacement and repairs)   l   $1.27m Total payout by client to insured   R   $353k Benpower restoration cost      20 Days Timing   ...
Production of Silicons

Production of Silicons

Case Studies  Production of Silicons (Fire)   r   $762k Total estimate of damages (with replacement and repairs)   l   $105k Total payout by client to insured   R   $49k Benpower restoration cost      8-10 Days Timing   ...
Food Industry

Food Industry

Case Studies Food Industry (Fire) r $1.97m Total estimate of damages (with replacement and repairs) l $423k Total payout by client to insured R $141k Benpower restoration cost  12 Days Timing  $1.55m Total saving to insurer Before & Afters BEFORE BEFORE BEFORE...